This project involves the demolition of an existing parking lot to prepare the site for the construction of 28 townhomes. The development will include both enclosed and surface parking, accessible through an auto court off the existing alley. The work requires careful coordination of demolition, site preparation, and construction to meet safety and regulatory standards.
Demolish and remove the existing parking lot to clear the site for new construction. Develop a residential project consisting of 28 townhomes. Each unit will feature access to both enclosed and surface parking spaces. The parking areas will be designed and constructed with access provided via an auto court connected to the existing alleyway. Ensure all demolition, site preparation, and construction activities comply with local regulations and standards, maintaining safety and quality throughout the project duration.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Seattle — open one to see the scope, property details and photos, then submit a bid.