This project requires establishing temporary electrical power to support landscaping, pool, and restoration repairs at a residential property. The contractor must follow safety protocols, including lockout/tagout procedures, and is accountable for any damage caused by energized power. Inspector approval is required to release power, and a full electrical permit must be obtained within 30 days to avoid power disconnection.
Provide temporary electrical power solely for the purpose of restoring power to landscaping, pool, and restoration repair activities at the residential site. All work must comply with the inspector's approval; specifically, release of electrical power is authorized by Inspector Rich Lemcke. The contractor is fully responsible for implementing lockout/tagout procedures to ensure safety and must assume liability for any damages resulting from the electrical power being energized. It is mandatory to obtain a full electrical permit within 30 days of power activation. Failure to secure the required permit within this timeframe may result in the immediate disconnection of temporary power. This work is related to project reference COB25-00130.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 425 projects posted in Mesa — open one to see the scope, property details and photos, then submit a bid.
Mesa businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Mesa directory lists.
See every listed pro: Mesa contractors.