The project focuses on rehabilitating Reservoir No. 2 by replacing its liner and installing a new conduit to the GAC pump station. It also includes replacing the inlet gate seals on Reservoirs 1, 2, and 3 to enhance system performance and prevent leaks. The work aims to improve the infrastructure's durability and operational efficiency while adhering to safety and quality standards.
This project involves the comprehensive rehabilitation of Reservoir No. 2, including the complete replacement of its liner to ensure structural integrity and water tightness. Additionally, the scope includes the installation of a new conduit connecting Reservoir No. 2 to the GAC (Granular Activated Carbon) pump station to improve water conveyance and system efficiency. The project also requires the replacement of seals on the inlet gates of Reservoirs No. 1, No. 2, and No. 3 to restore proper sealing function and prevent leakage. All work must comply with applicable safety standards and industry best practices to ensure long-term operational reliability.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 425 projects posted in Mesa — open one to see the scope, property details and photos, then submit a bid.
Mesa businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Mesa directory lists.
See every listed pro: Mesa contractors.