The project requires installing a 9.7 kWh residential battery system alongside upgrading the main electrical panel to 225A. This ensures the home can safely accommodate the new energy storage system while meeting all relevant electrical codes and safety requirements.
This project involves the professional installation of a 9.7 kilowatt-hour (kWh) residential battery energy storage system. Additionally, the existing main electrical panel will be upgraded to a 225-ampere (A) capacity to support the increased electrical load and ensure system compatibility. The scope includes all necessary electrical work to integrate the battery system with the home's electrical infrastructure, adherence to local electrical codes and safety standards, and thorough testing to confirm proper operation and reliability.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Mesa — open one to see the scope, property details and photos, then submit a bid.
Mesa businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Mesa directory lists.
See every listed pro: Mesa contractors.