This project involves the installation of mini split air conditioning units in the office area and elevator shafts to provide effective cooling. Exhaust fans will be installed in the bathroom and storage room to enhance ventilation. Furthermore, a 10-foot gas pipe will be installed from the meter to the backup generator to ensure proper fuel delivery. All work will adhere to applicable safety and quality standards.
Install one mini split air conditioning unit in the office area and one mini split unit in each elevator shaft to ensure proper climate control. Install exhaust fans in both the bathroom and the storage room to provide adequate ventilation and maintain air quality. Additionally, install approximately 10 feet of gas piping from the meter to the backup generator to support its fuel supply. All installations must comply with relevant codes and standards, ensuring safety, efficiency, and reliability throughout the system.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Omaha — open one to see the scope, property details and photos, then submit a bid.
Omaha businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Omaha directory lists.
See every listed pro: Omaha contractors.