The project entails relocating an existing utility transformer and installing new concrete pads for critical electrical equipment, including a transformer, switchgear, and generator with a diesel fuel tank. It requires trenching, conduit installation, wiring, and intercepting primary utility feeds to create a fully integrated backup power system. This system will provide uninterrupted power supply to the store during outages, supporting Walmart’s commitment to serving the community reliably.
This project involves the relocation of the existing utility transformer and the installation of two to three new concrete housekeeping pads to support the transformer, switchgear, and generator with an integrated sub-base diesel belly tank. The scope includes trenching and installing conduit and wiring to interconnect all equipment. Additionally, the project requires intercepting the primary utility feeds onsite to enable seamless integration. The objective is to establish a reliable backup power system that ensures continuous store operations during power outages, allowing Walmart to maintain its service to the local community by supplying essential goods without interruption.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Memphis — open one to see the scope, property details and photos, then submit a bid.
Memphis businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Memphis directory lists.
See every listed pro: Memphis contractors.