This project involves installing around 30 feet of new gas piping with three dedicated gas drops for a stove, furnace, and water heater. After installation, a thorough gas pressure test must be conducted to verify the integrity and safety of the gas line system.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.