The project requires replacing an aging underground electrical switch and associated splices and terminations, followed by site restoration. Stormwater runoff control measures must be in place to maintain proper drainage along the adjacent pavement. Compliance with local regulations prohibits above-ground structures within five feet of the pavement edge. Excavation near monuments requires prior inspection and adherence to state law to avoid significant fines.
This project involves the replacement of an aging underground 3-way to 2-way switch within a new No. 6 box, including the replacement of underground splices and terminations as specified in the project drawings. All work must comply with applicable safety and quality standards. Following the electrical work, full site restoration is required. Measures must be implemented to control runoff and ensure the uninterrupted flow of stormwater along the pavement adjacent to the parcel. No above-ground structures are permitted within five feet of the pavement edge, in accordance with local ordinance 17.124.030. Additionally, if excavation occurs within 25 feet of any monument, compliance with State Law 8771 is mandatory. The project team must contact the inspector prior to beginning any excavation to avoid penalties, which include a minimum fine of $5,800 for non-compliance.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Oakland — open one to see the scope, property details and photos, then submit a bid.
Oakland businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Oakland directory lists.
See every listed pro: Oakland contractors.