The project scope for building project RBC2300745 has been revised to exclude the front addition. Structural changes are required to reflect this scope reduction. The existing rubble retaining wall along the street will remain unchanged, and planned siding replacement has been canceled. The work should focus on implementing these scope changes while maintaining structural safety and code compliance.
This project involves a revision to the original scope of building project RBC2300745. The planned front addition has been removed from the project scope and will no longer be constructed. As a result, related structural modifications must be made to accommodate this change. The existing rubble retaining wall along the street is to remain intact and unchanged. Additionally, the siding work originally planned will be canceled and will not be redone. All adjustments should ensure structural integrity and compliance with applicable building codes while reflecting the updated project scope.
Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 projects posted in Oakland — open one to see the scope, property details and photos, then submit a bid.
Oakland businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Oakland directory lists.
See every listed pro: Oakland contractors.