This project requires obtaining a permit extension through July 1, 2025, to proceed with Phase 1 construction of nine townhouse units within a 27-unit development. The units will be two-story wood-frame buildings with basements, including sidewalks, parking, and trash facilities. All site work plans are complete, and subcontractors must secure separate permits for electrical, plumbing, HVAC, and sprinkler systems. Construction must adhere strictly to approved plans and relevant codes.
This project involves securing a permit extension valid through July 1, 2025, for the construction of Phase 1 of a larger townhouse development. Phase 1 includes the construction of nine new townhouse units, arranged in two buildings located along Orchard Ridge Boulevard, as part of a total 27-unit townhouse project. The site work plans (No. 2021-1866) and ESD No. 8110 for the entire project have been completed and approved. Each townhouse unit will be two stories with a basement, constructed using wood framing. The scope includes installation of front and rear sidewalks, parking spaces for two vehicles per unit, and a designated trash can corral area. Separate permits are required and must be obtained by subcontractors for electrical, plumbing, HVAC, and sprinkler systems. All construction and installations must comply with the approved plans and applicable building codes.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Baltimore — open one to see the scope, property details and photos, then submit a bid.
Baltimore businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Baltimore directory lists.
See every listed pro: Baltimore contractors.