Relocation of 100 Amp Feeder to Indoor 200 Amp Panel with Sub-Feed Breaker

5603 S FOUNTAIN ST, SEATTLE, WA, 98178
Electrical

This project involves moving a 100 amp electrical feeder from an outdoor disconnect to an indoor 200 amp panel. The feeder will be connected as a sub-feed on a 100 amp breaker within the panel. The work must adhere to electrical codes, ensuring safe and compliant installation with proper labeling and secure conductor routing.

Project details

Relocate an existing 100 amp feeder currently connected to an outdoor disconnect to an indoor 200 amp electrical panel. The 100 amp feeder will be installed as a sub-feed on a dedicated 100 amp breaker within the 200 amp panel. All work must comply with applicable electrical codes and standards, ensuring proper connections, secure mounting, and safe routing of conductors between the outdoor disconnect and the indoor panel. The installation should maintain system integrity and provide clear labeling for future maintenance and inspections.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Seattle, WA

12 projects posted in Seattle — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Seattle, WA

Seattle businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Seattle directory lists.

See every listed pro: Seattle contractors.

Relocation of 100 Amp Feeder to Indoor 200… | Seattle, WA