This project involves the removal and replacement of the split heat pump system in the utility closet of Unit 8. The work must be performed in accordance with commercial HVAC standards and local codes, ensuring safe and efficient operation of the new system. Special attention should be given to refrigerant handling, electrical connections, and any flood zone considerations as directed.
Perform a complete replacement of the existing split heat pump system located within the utility closet of Unit 8. This project requires the removal of the current HVAC equipment and installation of a new, energy-efficient split heat pump system. All work must comply with applicable commercial HVAC standards, local building codes, and safety regulations. The replacement should ensure optimal system performance, proper refrigerant handling, and secure electrical and mechanical connections. Coordination with building management and adherence to flood zone precautions are essential if directed.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Raleigh — open one to see the scope, property details and photos, then submit a bid.
Raleigh businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Raleigh directory lists.
See every listed pro: Raleigh contractors.