Installation of 24kW Standby Generator with Automatic Transfer Switch

6477 SW PARKHILL WAY, PORTLAND, OR, 97239
General Construction

This project requires the installation of a 24kW standby generator equipped with an automatic transfer switch. The work includes site preparation, electrical connections, and configuration of the ATS to ensure automatic power transfer during outages. The system must be thoroughly tested and commissioned to guarantee reliable and safe operation.

Project details

Perform the installation of a 24kW standby generator system, including the integration of an automatic transfer switch (ATS). The scope of work involves site preparation, mounting the generator, connecting all electrical wiring in compliance with applicable codes and standards, and ensuring the ATS is properly configured to automatically transfer power during outages. Testing and commissioning of the complete system must be conducted to verify reliable operation and seamless power transfer. All work should adhere to safety regulations and manufacturer specifications.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Portland, OR

12 projects posted in Portland — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Portland, OR

Portland businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Portland directory lists.

See every listed pro: Portland contractors.

Installation of 24kW Standby Generator… | Portland, OR