Concrete Pouring Operation – 500 Cubic Yards with Two Pump Trucks

4110 NE HALSEY ST, PORTLAND, OR, 97232
General Construction

On April 14, 2025, a concrete pour of 500 cubic yards will take place at 4110 NE Halsey, utilizing two pump trucks. Both trucks must arrive by 4:00 AM for setup, with pumping beginning at 5:00 AM and continuing until the pour is complete. The operation requires careful coordination to ensure timely and efficient completion within the three-hour window.

Project details

This project involves a concrete pouring operation scheduled for April 14, 2025, from 4:00 AM to 7:00 AM at 4110 NE Halsey. The scope includes pouring 500 cubic yards of concrete using two pump trucks. Both pump trucks are required to arrive on-site by 4:00 AM to allow for setup and preparation. Pumping will commence promptly at 5:00 AM and continue until the completion of the pour. All equipment and personnel must be coordinated to ensure a smooth, continuous pour within the designated timeframe. Proper site access and safety protocols must be observed throughout the operation.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Portland, OR

12 projects posted in Portland — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Portland, OR

Portland businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Portland directory lists.

See every listed pro: Portland contractors.

Concrete Pouring Operation – 500 Cubic… | Portland, OR