This project requires the selective removal and replacement of lighting fixtures at designated locations as outlined in the photometric plans. Only specified fixtures will be replaced with new, lower-wattage models, while all other existing fixtures and switches will remain unchanged. The existing lighting circuits will be reused, ensuring a reduction in overall electrical load without modifying the control infrastructure.
Remove existing lighting fixtures only at the locations specified in the provided photometric plans. Replace these fixtures with the new, specified models as indicated. All existing fixtures not explicitly identified for replacement within the scope of work shall remain untouched, with no modifications or alterations permitted. The new fixtures to be installed have lower wattage ratings than the existing units, resulting in a reduction of overall circuit load. Existing lighting circuits will be reused without alteration. All existing switches controlling the lighting circuits shall remain in place and unchanged throughout the project.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Denver — open one to see the scope, property details and photos, then submit a bid.
Denver businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Denver directory lists.
See every listed pro: Denver contractors.