This project involves installing an 82-foot, 2-inch polyethylene gas line for a residential pool in Marron. The gas pipe must be buried at least 18 inches underground and accompanied by an 18-gauge yellow tracer wire for safety and detection purposes. The gas line will connect the meter to the pool heater, ensuring a safe and efficient gas supply for pool heating.
BidBro wrote this title, summary and the project details below from the building permit, with software. They are not the words of the permit office or of the contractor, and the permit does not rate how well the work was done.
The permit’s own description: “Marron residental pool with gas line, 82' of 2" pe gas pipe, buried 18" below grade w/18ga yellow tracer wire (meter to heater)”
Install an 82-foot length of 2-inch polyethylene gas pipe for a residential pool project in Marron. The gas line must be buried at a minimum depth of 18 inches below grade. Include an 18-gauge yellow tracer wire alongside the gas pipe to ensure easy location and safety compliance. The gas line will run from the meter to the pool heater, providing a reliable and code-compliant gas supply for pool heating.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 425 projects BidBro lists in Mesa. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, and photos where the record has them.
Businesses in BidBro's Mesa directory whose profiles carry a business description, imported customer reviews, permit history or a trade license. Each profile says where the business is based.
See every listed pro: Mesa contractors.