Relocation of Electrical Equipment to H-Frame per Addenda and Code Modifications

1808 N MAPLE CIR, MESA, AZ, 85205
General Construction

This project requires relocating key electrical components—including the point guard battery, load hub, utility AC disconnect, and DER meter disconnect switch with associated equipment—to an H-frame structure. The work must adhere to addenda instructions and code modifications, ensuring all equipment is safely and correctly installed and connected in compliance with applicable standards.

Project details

The scope of work involves relocating the point guard battery, load hub, utility AC disconnect, and the DER meter disconnect switch along with all dedicated DER meter equipment to an H-frame structure. This relocation is required to comply with addenda directives, deferred work adjustments, and applicable code modifications. All equipment must be securely mounted and properly connected to ensure operational integrity and safety. The contractor shall verify all connections and coordinate with relevant utility providers to minimize downtime and ensure compliance with electrical codes and standards throughout the relocation process.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Mesa, AZ

12 projects posted in Mesa — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Mesa, AZ

Mesa businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Mesa directory lists.

See every listed pro: Mesa contractors.

Relocation of Electrical Equipment to H-Frame… | Mesa, AZ