Residential Installation of 13.5 kWh Battery Storage System

3333 E JAVELINA AVE, MESA, AZ, 85204
$12,000
General Construction

This project involves the complete installation of a 13.5 kWh battery storage system in a residential setting. The work includes site evaluation, secure mounting, electrical connections following safety codes, system testing, and thorough documentation to ensure a safe and efficient battery integration.

Project details

Perform the professional installation of a 13.5 kWh residential battery storage system. This includes site assessment, mounting the battery unit securely, connecting the battery to the existing electrical system in compliance with all relevant electrical codes and safety standards, and testing the system to ensure proper operation. The installer must coordinate with the homeowner and any other contractors as needed to complete the installation efficiently and safely. Documentation of the installation process and system specifications must be provided upon completion.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Mesa, AZ

12 projects posted in Mesa — open one to see the scope, property details and photos, then submit a bid.

Residential Installation of 13.5 kWh Battery Storage System