This project requires replacing a residential electric panel rated at 200 amps or less in compliance with City of Mesa codes and utility requirements. Contractors must not disconnect utility wires or meters themselves; instead, they must coordinate with the appropriate utility provider to schedule necessary disconnects and reconnects. Pre-construction meetings with the utility may be mandatory, and failure to comply with these coordination requirements can result in additional fees and delays.
BidBro wrote this title, summary and the project details below from the building permit, with software. They are not the words of the permit office or of the contractor, and the permit does not rate how well the work was done.
The permit’s own description: “Replacement of 200 amp (or less) electric panel - no plans required. Installation shall comply with city of mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. The act of self disconnecting utility wires or meters is prohibited and may cause damage or injuries. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility(either srp at [contact details hidden] or city of mesa electric utility at engineering - electricatmesaaz.gov) for util…”
This project involves the replacement of a residential electric panel rated at 200 amps or less. No construction plans are required for this work. All installation activities must fully comply with the City of Mesa electrical codes as well as the requirements set forth by the servicing electric utility. Under no circumstances shall utility wires or meters be disconnected by the contractor or homeowner, as self-disconnection is strictly prohibited due to the risk of damage or injury. Failure to properly schedule utility disconnection with the appropriate utility provider may result in additional trip charges and fees for any damage caused to utility equipment. Prior to commencing work, it is mandatory to coordinate with the applicable utility—either SRP at [contact details hidden] or City of Mesa Electric Utility via [contact details hidden]—to schedule a pre-construction meeting and obtain all utility-specific service requirements related to the permit. Disconnect and reconnect fees or other charges may be assessed separately by the utility and are not included in permit fees. Depending on the utility provider, attendance at a pre-construction meeting may be mandatory before scheduling any utility disconnect or reconnect. Strict adherence to these requirements is essential to avoid delays and additional fees.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 425 projects BidBro lists in Mesa. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, and photos where the record has them.
Businesses in BidBro's Mesa directory whose profiles carry a business description, imported customer reviews, permit history or a trade license. Each profile says where the business is based.
See every listed pro: Mesa contractors.