This project involves the residential installation of a single SolarEdge battery, strictly following the 2018 IRC, manufacturer guidelines, and utility provider specifications. The permit excludes photovoltaic system installation. The installer must not disconnect utility wires or meters independently and must coordinate with the utility to schedule any necessary disconnects and reconnects. Compliance with all utility service requirements is essential to avoid additional charges or damages.
This permit authorizes the installation of a single SolarEdge battery in a residential setting. All work must be performed in strict accordance with the 2018 International Residential Code (IRC), the manufacturer’s installation instructions, and the specifications provided by the serving utility provider. This permit does not cover the installation of photovoltaic (solar panel) systems. Under no circumstances should utility wires or meters be disconnected by the installer. Coordination with the serving utility is mandatory to schedule any required disconnect and reconnect services. The installer must obtain and comply with all utility service requirements relevant to the scope of work. Failure to properly schedule utility disconnects may result in additional trip charges and fees for any damage caused to the utility’s distribution equipment.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 425 projects BidBro lists in Mesa. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, property details and photos.
Mesa businesses whose profiles carry a business description, imported customer reviews, permit history or a trade license — the same pros the Mesa directory lists.
See every listed pro: Mesa contractors.