This project requires the replacement of a residential electric panel rated at 200 amps or less, following all City of Mesa codes and utility requirements. Contractors must not disconnect utility wires or meters themselves; instead, they must coordinate with the appropriate utility provider to schedule disconnects and reconnects. A pre-construction meeting with the utility may be mandatory. Failure to comply with these procedures can result in additional fees and potential damage to utility equipment.
This project involves the replacement of a residential electric panel rated at 200 amps or less. No formal plans are required for this work; however, all installation activities must strictly comply with the City of Mesa electrical codes and the requirements set forth by the servicing electric utility. Under no circumstances should utility wires or meters be disconnected by the contractor or homeowner, as self-disconnection is prohibited and may result in damage or injury. Failure to properly schedule a utility disconnect through the appropriate utility provider may lead to additional trip charges and fees for any damage caused to utility equipment. Prior to commencing work, the contractor must contact the applicable utility—either SRP at 602-236-0777 or City of Mesa Electric Utility Engineering at electric@mesaaz.gov—to coordinate a pre-construction meeting and obtain specific utility service requirements related to the permit. Depending on the utility provider, this pre-construction meeting may be mandatory before scheduling any disconnect or reconnect activities. Disconnect/reconnect fees or other charges may be assessed separately by the utility and are not included in permit fees. Strict adherence to these requirements is essential to avoid delays and additional costs.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Mesa — open one to see the scope, property details and photos, then submit a bid.