Sewer Lateral Repair and Replacement with Public Right-of-Way Excavation

Oakland, CA 94606
General Construction

This project involves repairing or replacing sewer lateral lines with excavation in the public right-of-way, requiring strict adherence to local and state regulations. Key requirements include compliance with monument protection laws, obtaining necessary permits with USA notifications, and following City of Oakland Public Works standards. Notification timelines vary based on district type and project duration. Additional permits may be required for work near creek channels. Coordination with city inspectors prior to excavation is mandatory to ensure compliance and avoid fines.

BidBro wrote this title, summary and the project details below from the building permit, with software. They are not the words of the permit office or of the contractor, and the permit does not rate how well the work was done.

The permit’s own description: “Repair/replace sewer lateral and excavate in public right-of-way. Overflow device may be needed. If working within 25' feet of a monument you must comply with state law 8771, contact the inspector prior to starting excavation: minimum $5,800.00 fine for non-compliance. Comply with all terms of city of oakland public works standards, street excavation rules, revised march 2015 and city council ordinance no. 13300 c.m.s. Five days prior notice required for work lasting five days or less in business/commercial districts; 72 hour notice in residential districts. Ten days prior notice required f…”

Project details

Perform repair or replacement of sewer lateral lines involving excavation within the public right-of-way. Installation of an overflow device may be required depending on site conditions. When excavation occurs within 25 feet of a monument, strict compliance with State Law 8771 is mandatory. Contact the city inspector prior to beginning excavation to avoid a minimum fine of $5,800 for non-compliance. All work must adhere to the City of Oakland Public Works Standards, Street Excavation Rules (Revised March 2015), and City Council Ordinance No. 13300 C.M.S. Notification requirements include providing at least five days’ notice for work lasting five days or less in business or commercial districts, 72 hours’ notice in residential districts, and ten days’ notice for work lasting six days or more in any district. A valid permit, which requires a USA (Underground Service Alert) number and date, must be obtained prior to starting work; permits are valid for 90 days. If the project is located on a designated creekside property, a creek protection permit is required. If the property is not flagged as creekside but the work is within 100 feet of a creek channel, a creek determination must be conducted to assess applicability of the creek protection ordinance. Contact Public Works Agency (PWA) inspection at [contact details hidden] or via email at [contact details hidden] prior to starting excavation.

Bidding on work like this?

Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.

Other projects in Oakland, CA

12 of the 746 projects BidBro lists in Oakland. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, and photos where the record has them.

Oakland, CA contractors with customer reviews on file

Businesses in BidBro's Oakland directory whose profiles carry a business description, imported customer reviews, permit history or a trade license. Each profile says where the business is based.

See every listed pro: Oakland contractors.

Sewer Lateral Repair and Replacement… | Oakland, CA