This project involves the installation of a 7.65 kW residential roof-mounted solar PV system with panels flush mounted to the roof. A third-party post-installation inspection is mandatory, and the inspection report must be submitted before the final inspection request can be made. Compliance with planning and inspection requirements is essential throughout the process.
Install a 7.65 kW residential solar photovoltaic (PV) system mounted flush to the roof surface. The installation must comply with all applicable codes and standards, ensuring panels are securely and neatly flush mounted to the roof as per planning requirements. Upon completion of the installation, a post-installation inspection must be conducted by a certified third-party inspector. The inspection report or letter from this third party must be submitted and approved prior to requesting the final inspection from the local authority. Coordination with planning and inspection officials is required to ensure all conditions are met.
Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 projects posted in Garner — open one to see the scope, property details and photos, then submit a bid.