Replacement of 5-Ton Split Gas HVAC System in Residential Home

4149 BRANDYWINE POINTE BLVD, OLD HICKORY, TN, 37138
General ConstructionHVAC

This project involves the removal and replacement of an existing 5-ton split gas HVAC system in a residential home. The scope includes proper disposal of the old unit, installation of the new system, and ensuring all gas and mechanical connections meet code requirements. The new system will be tested and commissioned to ensure safe and efficient operation.

Project details

Perform a complete replacement of the existing 5-ton split gas HVAC system in a residential property. This includes the removal and proper disposal of the current gas mechanical unit, installation of a new 5-ton split gas system, ensuring all mechanical and gas connections comply with local codes and manufacturer specifications. The project requires testing and commissioning of the new system to verify proper operation, safety, and efficiency. All work must be performed with attention to safety standards and minimal disruption to the residence.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Old Hickory, TN

5 projects posted in Old Hickory — open one to see the scope, property details and photos, then submit a bid.

Replacement of 5-Ton Split Gas HVAC… | Old Hickory, TN