This project involves the removal of an old stub pole situated off the roadway, ensuring no disruption to traffic. The excavation site must be backfilled with sandy loam soil and restored to a stable condition. The task is anticipated to take no longer than one hour, with a focus on safety and minimal environmental impact.
Austin Energy requires the removal of an existing old stub pole located off the roadway. All work must be conducted without impacting traffic flow. Upon removal, the resulting hole shall be properly backfilled and compacted using sandy loam soil to ensure site stability and restoration. The entire operation is expected to be completed within one hour. Contractors must ensure adherence to safety protocols and minimize any disturbance to the surrounding area.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Austin — open one to see the scope, property details and photos, then submit a bid.
Austin businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Austin directory lists.
See every listed pro: Austin contractors.