This project involves removing old cast-iron stack and drain pipes from three bathrooms and three kitchens and replacing them with new PVC piping. The work requires adherence to plumbing codes and standards to ensure a reliable, leak-free drainage system. Proper installation and safety compliance are essential throughout the process.
Remove the existing cast-iron stack and associated drain piping serving three bathrooms and three kitchens. Replace all removed piping with durable PVC piping that meets current plumbing codes and standards. Ensure proper connection, sealing, and venting to maintain system integrity and prevent leaks or blockages. Work must be performed with minimal disruption to the property and comply with all relevant safety and building regulations.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Boston — open one to see the scope, property details and photos, then submit a bid.
Boston businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Boston directory lists.
See every listed pro: Boston contractors.