This project involves installing a new 8-inch corrugated steel pipe sanitary sewer main approximately 100 feet long along NE Church Street. The contractor must verify the existing branch size and ensure proper connection and extension to the property line per applicable standards. Field verification of depth, location, and downstream connection to the public system is required before proceeding.
Install approximately 100 linear feet of 8-inch corrugated steel pipe (CSP) sanitary sewer main along NE Church Street, with an approximate depth of 8.2 feet. The contractor must verify that the existing branch connection is a minimum of 6 inches in diameter. Connect and extend the sewer main to the property line in accordance with Standard Drawing P-262, with an estimated length and depth of approximately 7 feet (exact length to be determined in the field). The connection point is located approximately 592 feet from the east right-of-way line of MLK Boulevard. The contractor is responsible for verifying the exact depth, location, and downstream connection point to the public sewer system through field investigation prior to construction. For additional information or coordination, contact extension 31026.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Portland — open one to see the scope, property details and photos, then submit a bid.
Portland businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Portland directory lists.
See every listed pro: Portland contractors.