The project requires upgrading a 125-foot monopole cell tower by installing antennas, radios, fiber and power cables, and related mounting hardware. At the tower base, a new equipment pad will be built to house a 20kW generator, wireless utility controller, and associated electrical components. All installations must comply with KBC 2018, avoid easement encroachments, and be permitted appropriately. The site is unmanned and no occupancy is allowed.
BidBro wrote this title, summary and the project details below from the building permit, with software. They are not the words of the permit office or of the contractor, and the permit does not rate how well the work was done.
The permit’s own description: “Adding antennas and radios to an existing 125' monopole. At the base in the leasing area will be adding a wuc and generator. Tower scope of work: · install (9) antennas · install (9) rrus · install (2) squids · install (1) sector mount kit · install (2) fiber cables · install (4) dc cables ground scope of work: · install 10'-0"x17'-0" equipment pad · install generac sdc020 20kw generator · install vertiv netsure x 744 wuc · install ice bridge 12'-6" long · install 200a meter and breaker in existing meter gang slot "b shall not encroach any easements or required yards. Separate permits requi…”
This project involves upgrading an existing 125-foot monopole cell tower by installing new antennas, radios, and associated equipment. The tower scope of work includes the installation of nine (9) antennas, nine (9) remote radio units (RRUs), two (2) squids, one (1) sector mount kit, two (2) fiber optic cables, and four (4) DC power cables. At the tower base within the leasing area, a new equipment pad measuring 10 feet by 17 feet will be constructed to support additional infrastructure. The ground-level scope includes installing a Generac SDC020 20kW generator, a Vertiv NetSure X 744 wireless utility controller (WUC), and a 12-foot 6-inch ice bridge to protect cables. Electrical work involves installing a 200-amp meter and breaker in the existing meter gang slot. All work must comply with the Kentucky Building Code (KBC) 2018 and must not encroach on any easements or required setback yards. Separate permits are required for any additional work beyond the defined scope. This is an unmanned site with no occupancy permitted during or after construction.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 925 projects BidBro lists in Louisville. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, and photos where the record has them.
Businesses in BidBro's Louisville directory whose profiles carry a business description, imported customer reviews, permit history or a trade license. Each profile says where the business is based.
See every listed pro: Louisville contractors.