This project involves drywall and paint repairs in units A, E, and the common hallway following water mitigation efforts. Lead-containing materials were identified only in the bathroom tiles of unit A and have been abated according to legal requirements. Repairs must be conducted using lead-safe practices, with reference to the attached lead survey results.
Perform drywall and paint repairs resulting from water mitigation damage in units A, E, and the common hallway. Prior to mitigation, these areas were tested for lead-containing materials. Lead was detected only in the ceramic tiles of the bathroom in unit A. This lead-containing material has been properly abated in accordance with all applicable laws and regulations by PW Stephens Environmental. Refer to the attached lead survey results for detailed information. All repair work must comply with lead-safe work practices to ensure occupant safety and regulatory compliance.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Oakland — open one to see the scope, property details and photos, then submit a bid.
Oakland businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Oakland directory lists.
See every listed pro: Oakland contractors.