This project involves the removal of the current electrical load center and installation of a new 200-amp main breaker load center with equivalent specifications. The work must be completed following all relevant electrical codes and safety guidelines to ensure a safe and fully operational electrical system.
Remove the existing electrical load center and replace it with a new 200-amp main breaker load center. The replacement must be performed on a like-for-like basis, ensuring the new load center matches the specifications and capacity of the original. All work should comply with applicable electrical codes and safety standards. Proper disconnection, removal, installation, and testing of the new load center are required to ensure safe and reliable operation.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 446 projects posted in Tucson — open one to see the scope, property details and photos, then submit a bid.
Tucson businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Tucson directory lists.
See every listed pro: Tucson contractors.