This project involves replacing an existing cooler system with a 4-ton heat pump unit mounted on the roof. The scope includes connecting the heat pump to existing ducts, installing a new return air duct, and performing required electrical wiring upgrades. The work must be completed in accordance with relevant codes and standards to ensure a safe, efficient, and fully functional HVAC system.
Perform the conversion of an existing cooler system by installing a 4-ton heat pump unit on the roof. The project includes connecting the new heat pump to the existing ductwork, fabricating and installing a new return air duct, and upgrading or installing necessary electrical wiring to support the new equipment. All work must comply with applicable electrical and mechanical codes, ensure proper integration with the current HVAC system, and maintain system efficiency and safety standards.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Tucson — open one to see the scope, property details and photos, then submit a bid.
Tucson businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Tucson directory lists.
See every listed pro: Tucson contractors.