This project involves upgrading the electrical service for Space 59 by replacing the existing 50-amp circuit with a 100-amp circuit. The work includes installing approximately 110 feet of underground conduit and wiring to connect Space 59 to Meter Pak No. 8. Proper conductor sizing and grounding will be implemented to meet safety and code requirements.
Replace the existing 50-amp electrical circuit serving Space 59 with a new 100-amp circuit. The upgrade includes installing underground conduit using 1 1/4-inch Schedule 40 PVC piping, approximately 110 feet in length. The wiring will consist of three conductors plus a neutral and ground: three wires sized appropriately for a 100-amp circuit, a neutral conductor sized No. 2 AWG, and grounding conductors sized No. 8 AWG and No. 2 AWG as required. The new circuit will connect Space 59 to Meter Pak No. 8, ensuring compliance with electrical codes and standards for safety and performance.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Tucson — open one to see the scope, property details and photos, then submit a bid.
Tucson businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Tucson directory lists.
See every listed pro: Tucson contractors.