This project requires the safe abandonment of the underground gas line servicing Building No. 8, followed by the installation of two 20-foot sections of 2-inch steel piping on the east and west sides of the building. The new piping will connect to the local gas piping system to provide service to all eight apartments. The work must adhere to relevant safety and regulatory standards.
The project involves the abandonment of the existing underground gas line running from the meter to both the east and west sides of Building No. 8. Following the abandonment, a 20-foot section of 2-inch steel piping will be installed on each side of the building. This piping will be connected to the local gas piping system (LGP) to serve and tie in all eight apartments within the building. All work must comply with applicable safety standards and local codes for gas line abandonment and installation.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Tucson — open one to see the scope, property details and photos, then submit a bid.
Tucson businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Tucson directory lists.
See every listed pro: Tucson contractors.