Upgrade Main Electrical Panel from 100A to 200A

3120 W UNION JACK ST, TUCSON, AZ, 85746
HVAC

This project involves upgrading the building's main electrical panel from 100 amperes to 200 amperes to support higher electrical loads and enhance system reliability. The scope includes removal of the existing panel, installation of a new 200A panel, and all necessary wiring and connections, ensuring compliance with applicable codes and safety standards.

Project details

Perform a comprehensive upgrade of the main electrical panel, increasing its capacity from 100 amperes to 200 amperes. This project includes the removal of the existing 100A panel, installation of a new 200A main panel, and all associated wiring and connections to ensure compliance with current electrical codes and safety standards. The upgrade must accommodate increased electrical load demands and improve overall system reliability. All work should be completed by a licensed electrician following local regulations and industry best practices.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Tucson, AZ

12 projects posted in Tucson — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Tucson, AZ

Tucson businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Tucson directory lists.

See every listed pro: Tucson contractors.

Upgrade Main Electrical Panel from 100A to 200A | Tucson, AZ