Upgrade the main electrical panel of a 1 or 2 unit residential building from 100 amps to 200 amps. This involves replacing the existing panel with a new 200-amp panel, ensuring compliance with electrical codes, obtaining permits, and performing thorough testing to guarantee safe and reliable operation.
Perform an upgrade of the main electrical service panel in a 1 or 2 unit residential building from the existing 100-amp capacity to a 200-amp capacity. This includes the removal of the current 100-amp panel, installation of a new 200-amp main panel, ensuring all wiring and connections comply with the latest electrical codes and safety standards. The work must be completed with minimal disruption to the residence, and all necessary permits and inspections should be obtained and passed. Proper labeling and testing of circuits after installation are required to ensure full functionality and safety.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Oakland — open one to see the scope, property details and photos, then submit a bid.
Oakland businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Oakland directory lists.
See every listed pro: Oakland contractors.