The project requires installing a new sewer line from a residential house to the municipal sewer system. It includes excavation, pipe installation, connection to the existing sewer, and site restoration, all performed in compliance with local codes and regulations. The contractor must manage permits and inspections while minimizing property disruption.
This project involves the installation of a new sewer line extending from the residential house to the municipal sewer tie-in point. The work includes excavation, pipe laying, connection to the existing sewer infrastructure, and proper backfilling and restoration of the affected area. All materials and workmanship must comply with local plumbing codes and regulations to ensure a durable and leak-free sewer connection. The contractor is responsible for obtaining any necessary permits, coordinating inspections, and ensuring minimal disruption to the property during the installation process.
Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 projects posted in San Antonio — open one to see the scope, property details and photos, then submit a bid.
San Antonio businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the San Antonio directory lists.
See every listed pro: San Antonio contractors.