This project involves the removal and replacement of a 320 amp self-contained meter pan that suffered from corroded lugs causing a partial power outage. An emergency reconnection was executed on June 13, 2025, following inspection coordination. The work requires thorough replacement and secure reconnection to restore safe and reliable electrical service.
Remove and replace one 320 amp self-contained meter pan. The existing meter pan exhibited corroded lugs, which resulted in a loss of power to one leg. An emergency reconnection was requested and performed on Friday, June 13, 2025, as coordinated with NOLA Inspections and inspector Chris Poleto. The replacement must ensure all connections are secure, corrosion-free, and compliant with applicable electrical codes to restore full and reliable power service.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in New Orleans — open one to see the scope, property details and photos, then submit a bid.
New Orleans businesses with imported customer reviews, permit history or a trade licence on file — the same pros the New Orleans directory lists.
See every listed pro: New Orleans contractors.