This project involves installing a new EPDM roof and modifying building openings by adding two large doors and closing off existing doors and interior windows with cinder block. Additionally, it requires the removal of nearly 300 linear feet of concrete flooring followed by the installation of a new concrete floor, ensuring all work complies with relevant construction standards and project requirements.
Perform installation of a new EPDM roofing system on the commercial and multifamily building. Modify existing openings by installing a new 36-foot exit door and a 72-foot front door. Close off existing door openings using cinder block masonry, and similarly close existing interior window openings with cinder block. Remove approximately 292 linear feet of existing concrete flooring and install a new concrete floor to meet project specifications and quality standards.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Baltimore — open one to see the scope, property details and photos, then submit a bid.
Baltimore businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Baltimore directory lists.
See every listed pro: Baltimore contractors.