The project requires asphalt restoration following a gas main line repair at 11708 Pearce Lane and an 8x4 foot asphalt patch on Pilimco Drive. The work includes removing damaged pavement and installing new asphalt to restore the affected roadway areas to their original condition.
This project involves restoration work following a gas leak repair. Specifically, the main gas line was hit at 11708 Pearce Lane, requiring restoration of the affected area. Additionally, an 8-foot by 4-foot asphalt restoration is needed on Pilimco Drive to address damage related to the repair activities. The scope includes proper preparation, removal of damaged asphalt, and installation of new asphalt to restore the roadway surface to its original condition, ensuring safety and durability.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 252 projects BidBro lists in Austin. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, property details and photos.
Austin businesses whose profiles carry a business description, imported customer reviews, permit history or a trade license — the same pros the Austin directory lists.
See every listed pro: Austin contractors.