Installation of Two 20-Amp Circuits and Main Disconnect for Greenhouse Addition

2112 SW LURADEL ST, PORTLAND, OR, 97219
General Construction

This project involves installing two dedicated 20-amp circuits from the basement subpanel to a new prefabricated greenhouse. The circuits will be connected to a two-pole main disconnect switch within the greenhouse for safe power management. The installation must adhere to all relevant electrical codes and standards to ensure safety and reliability.

Project details

Provide and install two dedicated 20-amp electrical circuits originating from the basement subpanel. Extend these circuits to the newly constructed prefabricated greenhouse. At the greenhouse, terminate the circuits at a two-pole main disconnect switch to ensure safe and convenient power control. All work must comply with applicable electrical codes and standards, ensuring proper circuit protection, wiring methods, and secure connections throughout the installation.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Other open projects in Portland, OR

12 projects posted in Portland — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Portland, OR

Portland businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Portland directory lists.

See every listed pro: Portland contractors.

Installation of Two 20-Amp Circuits… | Portland, OR