Installation of 26kW Generator with 200A Transfer Switch and 1.25" Gas Line

5420 SALMON RIVER CT, RENO, NV, 89511
General Construction

This project involves installing a 26kW generator along with a 200-amp automatic transfer switch at the McDonald Family Trust site. A 1.25-inch gas line will also be installed to provide fuel to the generator. All work must adhere to applicable safety and industry standards, with…

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.

Installation of 26kW Generator with 200A… | Reno, NV