This project requires performing an open cut excavation on a designated sidewalk area to repair a gas leak. After completing the repair, the sidewalk must be fully restored to its original condition, ensuring structural integrity and safety. The scope includes excavation, repair, backfilling, compaction, and surface restoration in compliance with applicable standards.
Perform maintenance work involving an open cut excavation measuring approximately 6 feet by 4 feet by 1 foot on sidewalk section S1 to access and repair a gas leak. Following the repair, restore the sidewalk to its original condition, ensuring safety, durability, and compliance with relevant standards and regulations. The work includes excavation, gas leak repair, backfilling, compaction, and final sidewalk surface restoration.
Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 projects posted in Houston — open one to see the scope, property details and photos, then submit a bid.
Houston businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Houston directory lists.
See every listed pro: Houston contractors.