This project involves the removal and replacement of existing wood-framed balconies with new pressure-treated wood framing and composite decking. Existing steel stairs and concrete landings will remain intact, with new steel guardrails installed to enhance safety and compliance. The work requires careful demolition, disposal, and reconstruction to ensure durability and adherence to building codes.
Remove and replace existing wood-framed balconies with new, like-for-like structures using pressure-treated wood framing and composite decking materials. The scope includes demolition and disposal of the current wood balconies while preserving the existing steel stairs and concrete landings. Install new steel guardrails on the stairs and landings to meet current safety standards. All work must comply with applicable building codes and ensure structural integrity and durability of the replaced balconies.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Stockton — open one to see the scope, property details and photos, then submit a bid.
Stockton businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Stockton directory lists.
See every listed pro: Stockton contractors.