Fire-Protected Energy Storage System Installation with 5.1 kWh Pro-B Batteries

17242 SEVEN SPRINGS WAY, RIVERSIDE, CA, 92504
Fire Protection

This project involves installing a fire-protected energy storage system composed of four Deye SE-G5.1 Pro-B batteries, each rated at 5.1 kWh. The work requires adherence to fire safety standards and includes battery handling, mounting, electrical integration, and system testing to ensure safe and efficient operation.

Project details

Installation and commissioning of a fire-protected energy storage system (FPESS) utilizing four Deye SE-G5.1 Pro-B lithium-ion batteries, each with a capacity of 5.1 kWh. The system must comply with all relevant safety standards for fire protection and energy storage. Responsibilities include proper handling, secure mounting, electrical integration, and testing of the battery units to ensure optimal performance and safety within the energy storage system framework.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.

Other open projects in Riverside, CA

12 projects posted in Riverside — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Riverside, CA

Riverside businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Riverside directory lists.

See every listed pro: Riverside contractors.

Fire-Protected Energy Storage System… | Riverside, CA