Installation of 7.6 kW Fire-Protected Energy Storage System with Tesla Backup Switch

14290 QUAIL RIDGE DR, RIVERSIDE, CA, 92503
Fire Protection

The project requires the installation of a 7.6 kW photovoltaic and fire-protected energy storage system comprising 19 solar modules and two battery units. It includes integration with a 200A load center and the installation of a roof-mounted Tesla backup switch (ATSFR) to provide reliable backup power. The work must ensure full compliance with safety and fire protection standards for energy storage systems.

Project details

This project involves the installation of a photovoltaic and energy storage system (PV/ESS) with a total capacity of 7.6 kW, consisting of 19 solar modules integrated with a 200A load center. The system includes two battery energy storage units designed for fire-protected energy storage (FPESS) compliance. Additionally, a roof-mounted Automatic Transfer Switch for Fire Recovery (ATSFR), specifically a Tesla backup switch, will be installed to ensure seamless backup power transfer during outages. The scope covers all electrical connections, mounting hardware, and safety compliance measures necessary to complete a fully operational, code-compliant energy storage solution.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.

Other open projects in Riverside, CA

12 projects posted in Riverside — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Riverside, CA

Riverside businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Riverside directory lists.

See every listed pro: Riverside contractors.