Installation of 10.665 kW Fire-Protected Energy Storage System with Backup Power Components

11050 CLEVELAND AVE, RIVERSIDE, CA, 92503
Fire Protection

The project requires installing a 10.665 kW fire-protected energy storage system composed of 27 PV modules, a 200A backup gateway, and a 225A backup loads panel. It includes one main battery ESS unit with an expansion pack and an automatic transfer switch designed for fire response. The installation must ensure seamless integration, reliable backup power, and compliance with fire safety regulations.

Project details

This project involves the installation and integration of a fire-protected energy storage system (FPESS) with a total capacity of 10.665 kW, consisting of 27 photovoltaic (PV) modules. The system includes a 200A backup gateway and a 225A backup loads panel to ensure reliable power supply during outages. The energy storage solution features one primary battery/energy storage system (ESS) unit, complemented by an expansion pack and an automatic transfer switch for fire response (ATSFR) to enhance system safety and operational flexibility. The scope requires careful coordination of all components to meet performance, safety, and fire protection standards.

Bidding on work like this?

Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.

Other open projects in Riverside, CA

12 projects posted in Riverside — open one to see the scope, property details and photos, then submit a bid.

Top-reviewed contractors in Riverside, CA

Riverside businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Riverside directory lists.

See every listed pro: Riverside contractors.

Installation of 10.665 kW Fire-Protected… | Riverside, CA