The project requires excavation and hydrant repair on a residential street for an emergency water line. The contractor must maintain continuous work and two-way traffic flow to avoid needing a traffic control permit. All traffic control and signage must comply with MUTCD standards. If two-way traffic cannot be maintained, the contractor must secure a traffic control permit before starting excavation. Safety and minimal disruption are priorities throughout the project.
This project involves excavation work for the repair of an emergency water line hydrant located on or near a residential street. Since the work area is residential, a traffic control permit is not required provided that the contractor performs continuous work and maintains two-way directional traffic flow at all times. However, all traffic control measures and signage must comply with Part 6 of the Manual on Uniform Traffic Control Devices (MUTCD). If maintaining two-way traffic flow is not feasible at any point during the excavation, the contractor is responsible for obtaining a traffic control permit through Compass KC prior to commencing any work within the roadway. The contractor must ensure that all traffic control and safety protocols are strictly followed to minimize disruption and maintain public safety throughout the project. This work is associated with emergency water line project number 80002486.
Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 projects posted in Kansas City — open one to see the scope, property details and photos, then submit a bid.
Kansas City businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Kansas City directory lists.
See every listed pro: Kansas City contractors.