The project requires excavation to reconnect gas service at 2919 Jarboe Street, involving a 2x4-foot hole and specific cuts near utility lines. The contractor must maintain two-way traffic flow and comply with MUTCD traffic control standards. No traffic control permit is needed if work is completed within 72 hours while maintaining traffic flow; otherwise, a permit must be obtained prior to excavation.
This project involves excavation work on a residential street to reconnect a gas service at 2919 Jarboe Street. The contractor is required to dig a 2-foot by 4-foot hole in the ground to complete the service reconnection. The excavation area includes a 2-foot cut west of the water curb box on Jarboe Street and a 3-foot cut south of the natural gas line, as per the attached drawings. Since the work is on a residential street and the contractor holds valid annual traffic control stickers, a traffic control permit is not required provided the work is completed within 72 hours while maintaining two-way directional traffic flow at all times. Traffic control and signage must comply with Part 6 of the Manual on Uniform Traffic Control Devices (MUTCD). If maintaining two-way traffic flow is not feasible, the contractor must obtain a traffic control permit through Compass KC before commencing excavation work in the roadway. All traffic control measures must ensure the safety of both workers and the public throughout the duration of the project.
Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 projects posted in Kansas City — open one to see the scope, property details and photos, then submit a bid.
Kansas City businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Kansas City directory lists.
See every listed pro: Kansas City contractors.