This project involves excavation and main repair on a residential street at 3838 N Brighton Avenue by a Spire/Missouri Gas Energy crew. The contractor must maintain two-way traffic flow and comply with MUTCD Part 6 traffic control standards. A traffic control permit is not required if the work is completed within 72 hours while maintaining traffic flow; otherwise, a permit must be obtained prior to excavation.
The excavation work will be performed on a residential street by a Spire/Missouri Gas Energy crew to repair a main at 3838 N Brighton Avenue. The contractor is required to dig a 2x4-foot hole in the pavement, located 13 feet east of the centerline of N Brighton Avenue and 4 feet south of the shoulder. Since the work is on a residential street and the contractor holds valid annual traffic control stickers, a traffic control permit is not required provided the work is completed within 72 hours and two-way directional traffic flow is maintained at all times. Traffic control and signage must comply with Part 6 of the Manual on Uniform Traffic Control Devices (MUTCD). If maintaining two-way directional traffic flow is not feasible, the contractor must obtain a traffic control permit through Compass KC before commencing excavation work in the roadway. All traffic control measures must ensure the safety of the public and workers throughout the duration of the project.
Browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 projects posted in Kansas City — open one to see the scope, property details and photos, then submit a bid.
Kansas City businesses whose profiles carry a business description, imported customer reviews, permit history or a trade licence — the same pros the Kansas City directory lists.
See every listed pro: Kansas City contractors.