This project requires converting a 600 sq ft garage into a code-compliant ADU featuring a bathroom and a multifunctional great room with kitchen, living, and bedroom spaces. All existing interior non-structural elements and systems will be removed and replaced. The unit must meet Title 24 energy standards and ensure all electrical and plumbing work complies with current codes. Exterior stucco must be matched to preserve the building's appearance.
The project involves converting an existing 600 square foot garage into a fully functional Accessory Dwelling Unit (ADU) within the current structural footprint. All existing interior non-structural walls, gypsum board, plumbing, and electrical systems will be removed to facilitate the renovation. The new ADU will include one bathroom and a great room that combines a kitchen, living area, and a bedroom separated by a custom entertainment center. The unit must be conditioned in compliance with Title 24 energy efficiency standards and incorporate all code-compliant electrical and plumbing systems. Exterior stucco finishes must be matched seamlessly in all renovated areas to maintain aesthetic consistency.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 879 projects BidBro lists in Sacramento. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, property details and photos.
Sacramento businesses whose profiles carry a business description, imported customer reviews, permit history or a trade license — the same pros the Sacramento directory lists.
See every listed pro: Sacramento contractors.